We are starting to receive inquiries about drainage projects, landscape design and landscape installations. As I’ve discussed in previous blogs, now is the best time for these inquires. There is plenty of time to properly plan, as it will be a little while before the weather fully cooperates and actual landscaping and/or construction can actually begin.
We received a request for a quote for landscaping work to be done in Roselle. The work is for a brick patio and some minor landscaping. Because we know that the work will be performed in Roselle, we already know of a couple things that will need to be accomplished before the work can begin. For instance, sometimes, it’s a good idea to have your underground utilities marked prior to beginning the design stage of the project. It’s best to know ahead of time if there is any underground wiring that will be affected by the project. We do know that this work will involve procuring a permit from the Village of Roselle. We also know that we, the contractor, will need a contractor’s license to work in Roselle. These are a few factors that can cause kinks in the flow of the work progression; however, if known about prior to beginning the job, these are things that can be taken care of without causing a problem. Once the design is completed and agreed upon by the contractor and our client, the plan will need to be submitted to the village for their approval and receipt of the permit. Most villages, including Roselle, require a scaled drawing and a plat of survey with any out buildings and/or structures drawn on the plat.
We have also received a quote request for drain tile work to be done in Schaumburg. Schaumburg is one of only a few villages that we know of that require a permit for drain tile work. Therefore, plans will need to be submitted to the Village and a permit obtained prior to this type of work beginning. Contractors will also need a contractor’s license to perform the job in Schaumburg.
Different towns, villages, townships, counties have different requirements. That’s another reason now is a great time to start planning. Now is the time to educate yourself about the permit process in your town. Don’t take for granted that just because you have an Addison or a Roselle mailing address that all you need is a permit from that town. You may actually be under the jurisdiction of the township or county (i.e., Addition Township, Milton Township, DuPage County…). Check with your contractor, if he doesn’t know then check for yourself.
Sometimes it can take a while to get the requirements necessary to perform your work and I can tell you from experience, it’s a lot easier and much smoother when you can give the village and the contractor a little bit of time to work together to ensure that the proper paperwork has been submitted.
Finally, planning now will undoubtedly result in a less stressful process for everyone involved, including yourself, your contractor & your governing bodies. So, now is the time to do some homework and get your dreams working to become your realities.